Documents & SMS: what SIRE 2.0 inspectors ask and find

Certificates, the safety management system and the PIQ have to agree with each other and with the ship, and the crew should know where the SMS covers each job.

Do this before the inspector arrives: Lay out certificates against the PIQ and know where the SMS covers each.

What the inspector wants to see

Questions inspectors ask about Documents & SMS

How do you keep the statutory certificates up to date, indexed and filed?
Inspectors check that every certificate is current and that the file is indexed so any certificate and its survey dates can be produced at once.
How do you verify that statutory certificates are authentic, and how often?
Cross-check certificate numbers against the class survey status report, and verify electronic certificates on the class/issuer website. Know the company's verification frequency.
Does the vessel have any conditions of class or memoranda?
A hard-copy class status report was asked for. Memoranda on statutory items are treated as conditions of class. The survey status report should also list CSM items.
How do you prove that drug and alcohol samples were actually collected?
Keep the sample receipts for each individual on board so the inspector can verify the samples were really taken.
Which visitors need a familiarisation, and what is it checked against?
Superintendents, surveyors, vetting inspectors, terminal and cargo reps, bunker suppliers, chandlers. Records must match the gangway log; sailing visitors do both pages.
How often are marine and technical superintendent visit reports expected?
Two combined reports within 14 months, no more than 7 months apart (including a 1-month grace period). Office visits at 6-month intervals.

There are 43 Documents & SMS questions in NilObs, with spaced repetition so the ones you miss come back. Practise them free.

Real Documents & SMS observations, and how to avoid them

From 51 de-identified observations in SIRE 2.0, CDI and pre-vetting reports from 2025 and 2026. Wording paraphrased; ship, crew and company names removed.

The company procedure for the Coating Technical File did not list its required contents (yard coating records, specs, inspection, repairs); these sat in a dry-dock folder.
Avoid it: Know what the Coating Technical File must contain and keep coating records in that file.
SIRE 2.0 · Chapter 2 Certification & documentation · Process observation
Records showed an eight-month gap between technical superintendent visits, with no other marine or safety superintendent visit in between.
Avoid it: Keep superintendent visit reports on board and flag to the office if visits are overdue.
SIRE 2.0 · Chapter 2 Certification & documentation · Process observation
A cargo audit finding (risk assessment reference missing from the cargo plan) was still open past its seven-day close-out deadline.
Avoid it: Track internal audit findings to closure within the deadline and update the system.
SIRE 2.0 · Chapter 3 Crew management · Process observation
The SMS required an up-to-date certificate index in the statutory certificate files, but none was found in either file.
Avoid it: Keep the certificate index current and placed in the certificate files as the SMS requires.
SIRE 2.0 · Chapter 2 Certification & documentation · Human observation
Load line certificate showed winter and WNA marks not on the hull (WNA not applicable over 100 m), and IOPP Form B left fitted items unticked.
Avoid it: Cross-check certificate and IOPP supplement entries against the ship's actual marks and fittings.
SIRE 2.0 · Chapter 2 Certification & documentation · Process observation
Class had issued a conditional safety construction certificate because of the lost anchor.
Avoid it: Track conditional certificates' validity and the actions needed to clear them before expiry.
SIRE 2.0 · Chapter 2 Certification & documentation · Process observation
No records were on board of the previous marine superintendent inspection, so the interval between visits and shore review could not be checked.
Avoid it: Keep copies of previous superintendent inspection reports on board for review.
SIRE 2.0 · Chapter 2 Certification & documentation · Process observation
The International Ballast Water Management Certificate on board was a short-term certificate valid for only two months.
Avoid it: Track short-term certificate expiry and the repairs needed to obtain a full-term certificate.
SIRE 2.0 · Chapter 2 Certification & documentation

Who answers for Documents & SMS

Master, Marine Superintendent, Vetting Manager / Superintendent, HSEQ Manager, Designated Person Ashore, Fleet Manager, Crewing Manager, Other role. NilObs picks the questions and the daily drill for your role.

Rehearse Documents & SMS before your next inspection.
A 5-minute daily drill for your role, an AI inspector that grades your answers, and live industry updates. Free to start.
Start free

Other topics

ECDIS9 observationsRadar4 observationsUKC3 observationsPassage planning5 observationsGMDSS10 observationsAlarm & power-fail tests3 observationsEquipment tests vs PMS23 observationsRest hours & drills17 observationsDefect reporting29 observationsWatchkeeping16 observationsSteering2 observationsLSA & FFA31 observationsEngine room50 observationsCargo69 observationsPIQ accuracy46 observationsPermits & RA11 observationsEmergency equipment43 observationsGas testing & enclosed space61 observationsPPE & personal safety21 observationsPollution prevention27 observationsSecurity & cyber11 observationsTraining & certificates25 observationsHull & condition31 observationsMooring & access59 observations